Summary
Overview
Work History
Education
Skills
Timeline
Generic

Mohammad Al Mahasneh

Amman

Summary

Experienced Wind Energy Manager with over 14 years of proven success in optimizing energy performance. Proficient in managing energy projects, troubleshooting faults, and driving energy efficiency. Passionate about sustainable energy practices and committed to delivering results. I am excited to bring my expertise to action, working with a dynamic team to ensure efficient energy usage and contribute to the success of the organization. My track record of reducing energy costs and implementing innovative solutions makes me a valuable asset. In addition, I am currently working on a potential Hydrogen Project with a total capacity of 1 million tons.

Overview

15
15
years of professional experience

Work History

Wind Farm Manager

Abour Energy Company
07.2021 - Current

1. Ensure the highest level of health and safety practices on the wind farm.

2. Ensure the highest level of Environments practices such as bird monitoring, carcass search, on the wind farm.

3. Plan, schedule, and coordinate substation maintenance events. Respond to site outages as required, perform HV switching operations in order to safely return site to production in a timely manner.

4. Ensure that all maintenance activities, including those performed during scheduled outages and overhauls, are accurately recorded, and documented to identify the failure history, mean time between failures and root causes.

5. Develop and supervise the Operation protocol

6. Prepare and update multiple monthly reports (i.e.-Monthly Flash Report; Monthly Man-hour Report; Daily Report etc.), and informational spreadsheets to track site performance.

7. Assure operations performance targets (availability, dispatch, power vs. wind performance, budgets, etc.) are achieved for the

assigned wind farm(s).

8. Supervise the activities of the O&M Contractor Vestas and ensure operation and maintenance of the wind farm is in compliance with contracted requirements and performance targets.

9. Assist in the preparation of the annual site O&M budget and recommend capital improvements and enhancements.

10. Manage the spare part inventory for the wind farm.

11. Ensure daily, weekly, and monthly operations report are prepared and submitted on time.

12. Ensure compliance with all local, state regulatory requirements.

13. Interface with grid operator, NEPCO, where required.

14. Interface with landowners, local and state authorities, and the general public, where required.

15. Provide back-up support for work on other wind farms, including required nights and weekend operations coverage on a rotating basis as needed.

16. Prepare and implement community integration plan CIP.

Project Manager

Abour Energy Company
01.2019 - 06.2021
  • Coordinated and directed development, energy assessment, engineering, or construction activities to ensure that wind project needs and objectives are met.
  • Managed wind project costs to stay within budget limits.
  • Led and supported negotiations involving tax agreements or abatements, power purchase agreements, land use, or interconnection agreements.
  • Created wind energy project plans, including project scope, goals, tasks, resources, schedules, costs, contingencies, or other project information.
  • Supervised the work of subcontractors or consultants to ensure quality and conformance to specifications or budgets.
  • Developed scope of work for wind project functions, such as design, site assessment, environmental studies, surveying, or field support services.
  • Provided verbal or written project status reports to project teams, management, subcontractors, customers, or owners.
  • Updated schedules, estimates, forecasts, or budgets for wind projects.
  • Prepared or assist in the preparation of applications for environmental, building, or other required permits.
  • Reviewed or evaluate proposals or bids to make recommendations regarding awarding of contracts.
  • Managed site assessments or environmental studies for wind fields.
  • Prepare wind project documentation, including diagrams or layouts.
  • Reviewed civil design, engineering, or construction technical documentation to ensure compliance with applicable government or industrial codes, standards, requirements, or regulations.
  • 14. Prepared requests for proposals (RFPs) for wind project construction or equipment acquisition.
  • 15. Provided technical support for the design, construction, or commissioning of wind farm projects.

Site Manager

Jordan Wind Project Company
11.2015 - 12.2019
  • Coordinated and directed development, energy assessment, engineering, or construction activities to ensure that wind project needs and objectives are met.
  • Managed wind project costs to stay within budget limits.
  • Led negotiations involving tax agreements or abatements, power purchase agreements, land use, or interconnection agreements.
  • Designed wind energy project plans, including project scope, goals, tasks, resources, schedules, costs, contingencies, or other project information.
  • Supervised the work of subcontractors or consultants to ensure quality and conformance to specifications or budgets.
  • Developed scope of work for wind project functions, such as design, site assessment, environmental studies, surveying, or field support services.
  • Provided verbal or written project status reports to project teams,
  • management, subcontractors, customers, or owners.
  • Updated schedules, estimates, forecasts, or budgets for wind projects.
  • Prepared or assisted in the preparation of applications for environmental, building, or other required permits.
  • Evaluated proposals or bids to make recommendations regarding awarding of contracts.
  • Managed site assessments or environmental studies for wind fields.
  • Prepared wind project documentation, including diagrams or layouts.
  • Reviewed civil design, engineering, or construction technical documentation to ensure compliance with applicable government or industrial codes, standards, requirements, or regulations.
  • Prepared requests for proposals (RFPs) for wind project construction or equipment acquisition.
  • Provided technical support for the design, construction, or commissioning of wind farm projects.

Operations & Maintenance Manager

Jordan Wind Project Company
01.2014 - 12.2019
  • Designed Operation protocol
  • Set up a Maintenance plan
  • Prepared Monthly, quarterly, and annual reporting
  • Supervised all O&M works
  • Connected with grid operator, NEPCO, where required.
  • Managed the spare part inventory for the wind farm
  • Supervised all environment obligations (ESIA, ESMMP)
  • Ensured compliance with all local, and state regulatory requirements.
  • Interfaced with landowners, local and state authorities, and the general public, where required.
  • Designed and implemented Community integration plan CIP.

Electrical Maintenance Engineer

Samra Electrical Power Company
06.2011 - 12.2013
  • Team Leader in Samra Electric Power Co. (SEPCO) for Combined Cycle Power Plant Phase I, Phase II, and Phase III (since October 2011 to December 2013) with a total capacity of three phases of CCPP is 3X300MW.
  • Overall Supervision and Administration of Electrical Maintenance Team.
  • Preparing of Preventive & Routine Maintenance Schedules.
  • Make Trouble Shooting for any Electrical Problems in The Power Plant Which Include Major Components and Auxiliaries Systems to Fixed it.
  • Dealing with Advanced Electrical Components Digital Management Relays and Software (Like GE SR-series, G60, T60, Micom, M-3425, NR …etc)
  • Dealing with Electrical Components Test Equipment, Like Fraja Secondary Injection, Transformer Turin Ratio TTR, Transformer Capacitance (DELTA-2000, Pax IDAX), Circuit Breaker Analyzer (CAT60), Insulation Resistance, CT Ratio tester, CT Burden Tester … etc.
  • Preparing Spare Parts Lists for All Electrical Systems.
  • Conducting Training & Seminars for the Employees to get the Active Participation on Regular Safe Mode Operation.
  • Formulation the ERP system for the Electrical Systems
  • Installations in the Plant & Witness for All Electrical Tests in Phase III Samra Project

Electrical Project Engineer

Samra Electrical Power Company
04.2009 - 05.2011
  • Electrical engineer in project Department for Combined Cycle Power Project, Phase II and Simply Cycle Power Project Phase III (SSPP).
  • Facility Construction, Testing, and Commissioning works supervision, the Two HRSGs, One Steam Turbine and Generator Step Up Power Transformers (15/400) kV – 130 MVA, MV Switchgear (6.6) kV, LV Switchgear (0.4) kV, UPS, and DC System. 6.6KV motor, 400V motor...Etc.
  • Facility Construction, Testing, and Commissioning work supervision, the facility consists of (Phase III) Two Gas Turbine (Alstom type GT13E2) and Two Generator Step Up Power Transformers (15/132) kV – 185 MVA for each, Two Step Down Unit Auxiliary Transformers (15/6.6) kV – 30 MVA for each, MV Switchgear (6.6) kV, LV Switchgear (0.4) kV, UPS and DC System, 6.6KV motor, 400V motor...Etc.
  • Participated in reviewing of drawings & schematic diagrams – of all electrical systems for Phase II and III, details design stage.
  • Supervise and instruct the performance of the works at the site to follow up on the conditions of the EPC contract made between the owner and the contractor.
  • Approved the shop drawings & as-built drawings proposed by the contractor prior to the commencement of implementation thereof.
  • Approved samples, specimens, and catalogs of materials presented by the contractor.
  • Carried out the final inspection and issue performance certificates

and final settlement of the dues of the contractor in light thereof.

Education

Master of Science - Business Administration And Management

Tafilah Technical University
At Tafilah, Jordan
05.2020

Bachelor of Science - Electrical Engineering

Balqa Applied University
Amman, Jordan
05.2009

Skills

  • Scheduling and Planning
  • Strategic Planning
  • Policies Management
  • Cost Estimation
  • Contract Management
  • Performance Improvements
  • Budget Administration
  • Engineering Design
  • Scope Definition
  • Environment & Social Impact Assessment
  • Operation & Maintenance Plan
  • Stakeholder Engagement Plan

Timeline

Wind Farm Manager

Abour Energy Company
07.2021 - Current

Project Manager

Abour Energy Company
01.2019 - 06.2021

Site Manager

Jordan Wind Project Company
11.2015 - 12.2019

Operations & Maintenance Manager

Jordan Wind Project Company
01.2014 - 12.2019

Electrical Maintenance Engineer

Samra Electrical Power Company
06.2011 - 12.2013

Electrical Project Engineer

Samra Electrical Power Company
04.2009 - 05.2011

Master of Science - Business Administration And Management

Tafilah Technical University

Bachelor of Science - Electrical Engineering

Balqa Applied University
Mohammad Al Mahasneh